Prefabricated Plant-manufacture,factory,supplier from China

(Total 24 Products for Prefabricated Plant)
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Contact Now
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Contact Now
InstructionPrimary heating, iron and metallic groups and thermal strength plant life in city wintry weather are large-scale coal-fired manufacturing, which has come to be the supply of air pollutants. in latest years, all localities have followed lively environmental protection guidelines.
  Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Contact Now
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt's far stated that because september 2021, the low-carbon generation manipulate crew of beijing university of technology has taken the lead and cooperated with eight devices, which incorporates the countrywide speed skating hall, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon funding generation co., ltd., beijing green trade co., ltd.
  Contact Now
Stainless steel heat exchanger is a kind of heat exchanger made of stainless steel. It has very good oxidation resistance, safety and health, and is widely used in food, medicine, heating, domestic water, air conditioning return water and other fields. According to the data of the heat exchange equipment promotion center, the stainless steel heat exchanger has better heat transfer effect and longer service life than the traditional carbon steel heat exchanger.Stainless steel heat exchanger has been widely used in many fields at present.
  Contact Now
Wear resistant steel plate refers to special plate products specially used under large area wear conditions. The commonly used wear-resistant steel plate is a plate product which is made by overlaying a certain thickness of alloy wear-resistant layer with high hardness and excellent wear resistance on the surface of ordinary low carbon steel or low alloy steel with good toughness and plasticity. In addition, there are cast wear-resistant steel plates and alloy quenched wear-resistant steel plates.
  Contact Now
InstructionFlue gas desulfurization and denitration generation is a boiler flue gasoline purification technology completed to the chemical industry of multi nitrogen oxide and sulfur oxide technology. nitrogen oxides and sulfur oxides are one of the foremost property of air pollutants. therefore, the software of this era has many benefits for ambient air purification.
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!Under Construction
  Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contact Now
InstructionCentral heating, iron and steel enterprises and thermal power plants in urban winter are large-scale coal-fired production, which has become the source of air pollution. In recent years, all localities have adopted active environmental protection policies.
  Contact Now
IntroductionSteel bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by British engineer Donald Bailey at the beginning of World War II in 1938. The main design concept is to assemble the fabricated steel bridge with the least kinds of unit components, which can bear various loads and different spans, and only need to be transported by general medium-sized trucks. In special cases, it can be built entirely by manpower
  Contact Now
    Steel frame bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by the British engineer Donald Bailey at the beginning of the Second World War in 1938. The main design concept is to assemble the assembled steel bridge with the least types of unit members, which can bear various loads and different spans, and only need to be transported by ordinary medium-sized trucks.
  Contact Now
Basic InstructionRecently, the provincial Xiaoqing River comprehensive management leading group came to our city to supervise and inspect the comprehensive management of ecological environment in Xiaoqing River Basin. Vice Mayor Wang Xinwen attended the event.Site DisplayConstruction Process
  Contact Now
Relate News
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
Jinan Changqing District National Fitness Center Reconstruction Project is located in the west of Changqing District People's Court and north of Qinghe Street, which is a key construction project in Changqing District. Jinan Changqing District Education and Sports Bureau invested about 140 million yuan to build Changqing District National Fitness Center, with a total construction area of 21,772.21 square meters, including 16,092.96 square meters above ground, 5,679.25 square meters underground and 23.5 meters high.
In 2021, the results of the selection of "2020 World's Best Stadium" initiated by the world-renowned professional stadium data website StadiumDB will be announced. The outstanding performance in terms of value, functionality and innovation was selected by the jury of the expert group of architects and was selected as the 20th place in the "Best Stadium of 2020".
         The urban expressway Shanhai Road construction project undertaken by Shandong Guoshun Group is the first expressway after the release of Yantai's "12335" policy plan, which is of great significance to improving the quality of urban functions and enhancing the ability of the central city to radiate and drive. The project starts from the Tashan Tunnel in the north and ends at Lvsida Road in the south, with a total length of about 5.624km.
The Dubai Expo 2020 has come to a glorious end. As the "finale" of the series of provincial activities of The China Pavilion, the opening ceremony of Shandong Week attracted political and business representatives from many countries, regions and international organizations from all over the world to participate in the event online and offline.
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring
On June 30, 2022, nearly 40 new employees came to the group headquarters to jointly participate in the 2022 youth plan growth training camp of Guoshun group for a period of 10 days.
Sheikh Abdullah Al Salem Cultural Centre (ASCC) is a new world-class museum district within Kuwait City. Together with the Sheikh Jaber Al Ahmad Cultural Centre (JACC), and recently restored Al Salam Palace, also SSH projects, it will form Kuwait’s new national cultural district,GuoShun Group supply the Main steel structure,SSH as general contractor.The museums are a celebration of Kuwaiti, Islamic and Arab culture and history.