Curtain wall is the exterior wall enclosure of a building, which does not bear weight and is hung like a curtain, so it is also called "curtain wall". It is a light wall with decorative effect commonly used in modern large and high-rise buildings.
Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
Contact Now
Basic InstructionThe whole process supervision and inspection of the project was completed by the international well-known bureau veritas. The design, production and full assembly services of Guoshun group were evaluated as "very satisfied" by the owner icafal Ingenier í a Y constructi ó n S.A. (the sixth largest general contractor in Chile and rated as the national champion of Chilean construction sustainable development company by the Chilean house of Representatives).Site Display
Contact Now
Basic InstructionThe complete process supervision and inspection of the assignment changed into completed with the aid of the international well-known bureau veritas. the layout, production and full assembly offerings of guoshun organization had been evaluated as "very glad" by using the owner icafal ingenier í a y constructi ó n s.a. (the 6th largest standard contractor in chile and rated because the countrywide champion of chilean creation sustainable development business enterprise through the chilean residence of representatives).Site Display
Contact Now
IntroductionSteel bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by British engineer Donald Bailey at the beginning of World War II in 1938. The main design concept is to assemble the fabricated steel bridge with the least kinds of unit components, which can bear various loads and different spans, and only need to be transported by general medium-sized trucks. In special cases, it can be built entirely by manpower
Contact Now
Steel frame bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by the British engineer Donald Bailey at the beginning of the Second World War in 1938. The main design concept is to assemble the assembled steel bridge with the least types of unit members, which can bear various loads and different spans, and only need to be transported by ordinary medium-sized trucks.
Contact Now
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
Contact Now
Basic InstructionAccording to executive director Sun Deshan, the international trade business of Guoshun group has become one of the "troikas" in parallel with the main environmental protection industry of air pollution control and the green fabricated steel structure construction industry. In the international market, it mainly undertakes steel structure engineering projects and flue gas treatment projects, especially steel structure engineering projects.
Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
Contact Now
Basic InstructionWe have a valid gadget of qualifications, the present metallic shape engineering contracting qualification (Level I), metallic shape production and set up qualification (Level I), mild metallic shape engineering layout qualification (Grade A), mechanical and electric creation wellknown contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in general with 20 qualifications.Steel construction projectTanzania steel bridgeSteel projects in China
Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
Contact Now
Basic InstructionRonald lwakatare, leader government of tanzania's rapid transit authority, said that they had obtained $148.1 million for segment iii and $99.9 million for segment iv. "the finances acquired will contribute to the actual construction of brt infrastructure, and the government might be chargeable for compensating individuals who could be affected by the challenge," he stated.
Contact Now
On April 20, the closing ceremony of the Tanzanian new WAMI bridge built by Chinese enterprises was held in msata city. Chinese ambassador to Tanzania chenmingjian and Tanzanian Minister of national engineering makamembalawa attended the ceremony. The new WAMI bridge is 310 meters long and 11.85 meters wide. It is a two-way single lane bridge across both banks of the WAMI river., In sharp contrast to the old WAMI bridge not far away.
Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
Contact Now
Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
Contact Now
Basic InstructionAccording to the relevant person in charge of the South extension project of Shunhe expressway, the South extension of Shunhe expressway will realize multi-level and full coverage of BRT + rail transit + ordinary bus + tourist bus, maximize the high-quality road resources, tilt to slow and public transport, make public transport travel more convenient, give priority to public transport signals, implement green wave traffic, intelligent monitoring of the whole line, and use information technology to improve traffic management level and travel service level.
Contact Now
Basic InstructionThe complete procedure supervision and inspection of the assignment was finished by the worldwide famous bureau veritas. the layout, manufacturing and full meeting offerings of guoshun institution have been evaluated as "very satisfied" via the owner icafal ingenier í a y constructi ó n s.a. (the sixth biggest wellknown contractor in chile and rated as the countrywide champion of chilean construction sustainable development employer by using the chilean house of representatives).Site Display
Contact Now
Light weight: the strength of steel is higher, flexibility is also high, compared with the traditional reinforced concrete building, its high strength, light weight, all rigid frame rigidity, forming ability is strong.
Contact Now
TypesSome common types of steel buildings are "straight-walled" and "arch," or Nissen or Quonset hut. Further, the structural type may be classed as clear span or multiple span. A clear span building does not have structural supports (e.g. columns) in the interior occupied space.Straight-walled and arch type refer to the outside shape of the building. More generally, these are both structural arch forms if they rely on a rigid frame structure.
Contact Now
They have lots of advantages:Energy saving and environmental protection, using light steel, can be recycled 100%, breaking the traditional demolition and construction pollution; Windproof and seismic, steel structure housing has high seismic performance, can withstand hurricanes and snowstorms and other natural disasters; Sound insulation and fire prevention; High aluminized zinc material, strong corrosion resistance, structural life is much longer than brick and concrete buildings; Save time limit; The construction environment is less affected by climate conditio
Contact Now
Basic InstructionShandong GuoShun International trade co., ltd. AND Afghan ARYANA NAWEEN BERADRAN CONSTRUCTION AND ROAD BUILDING COMPANY AFN ACCT signed a contract for the steel structure Bridges on June 22, 2018.
Contact Now
H-section steel is a kind of economic section high-efficiency profile with more optimized section area distribution and more reasonable strength weight ratio. It is named after its section is the same as the English letter "H". Since all parts of H-shaped steel are arranged at right angles, H-shaped steel has been widely used for its advantages of strong bending resistance, simple construction, cost saving and light structure weight in all directions.
Contact Now